The last lock-keeper on the Wenning Cut
Hal Bennison opens the top gate of Lock 9 at a quarter past seven, whether or not a boat is waiting. He has done it since 1987, when the Wenning Cut still carried coal barges to the gasworks at Thursby and there were eleven keepers on its fourteen miles. Now there is one, and the gasworks is a car park with a plaque.
The Cut was dug between 1794 and 1801 to save the barges a long loop of tidal river. It climbs ninety-one feet in nine locks, each one a stone chamber seventy-two feet long and fourteen wide, just big enough for a single narrowboat or a pair of the old open barges lashed side by side. The canal company built a cottage at every lock. Seven of them are holiday lets. One is a tea room that opens on Sundays from Easter to October. Hal lives in the last one that is still a keeper’s house.
“People think the job is pushing the beams,” he says, leaning on one. It is oak, a foot square, worn pale where four generations of hands have pressed it. “The beams are the easy bit. The job is water.” A lock, he explains, is a machine for spending water. Every time a boat goes down the flight, a chamberful runs out of the top pound and away to the river: about sixty thousand gallons at Lock 9. Let enough boats through on a dry August weekend and the pound above can drop until boats sit on the mud.
So Hal reads the canal the way a farmer reads a field. He knows that the pound between Locks 6 and 7 leaks through an old culvert in the bank, and loses two inches overnight in summer. He knows that a westerly wind piles water at the bottom end of the long pound and makes the gauge lie. He keeps a notebook, one page a day, with the level at each gauge board at seven in the morning and again at five. The notebooks go back thirty-nine years and fill a tea chest under the stairs.
The trust that owns the canal now has sensors. Since 2023, a box on a post at each pound sends a reading every fifteen minutes to an office in Leeds, and the readings appear as a blue line on a screen. Hal has seen the screen. He thinks it is very good at telling you what happened. “It can’t tell you that the Pearsons are bringing their boat up on Saturday with six grandchildren aboard, and they’ll want to work every lock themselves and leave half the paddles up.”
In winter the Cut is nearly empty. The hire boats are laid up at Thursby, and the few people who live aboard move only to fetch water or empty their tanks. This is when the real work happens. The trust drains a length of canal at a time, a process called a stoppage, and teams come in to replace gates, repoint the chamber walls and dredge the silt that has washed in from the fields. A lock gate lasts about twenty-five years. The bottom gates of Lock 9 were made in 2004 from green oak and fitted wet, and they will be due again in three winters.
Hal watches the stoppages closely, partly from interest and partly from habit. He was a carpenter before he was a keeper, and he still makes the wooden wedges that hold the gate collars tight, because the ones that arrive from the depot are softwood and swell badly. He shows me a box of them, each marked in pencil with the lock it is meant for. “Nine locks, nine slightly different gates,” he says. “They settle. You learn the lean of each one.”
There will not be another keeper after him, and he is not sentimental about it. The trust’s volunteers already work the flight on summer weekends, in green tabards, and he likes them. They are retired teachers and engineers, mostly, and a nineteen-year-old called Priya who is studying hydrology and has asked to borrow the notebooks. He has said yes, on condition that she types them up and gives the trust a copy, “so the blue line has something to argue with.”
At five o’clock he walks the towpath to the gauge board below Lock 8, reads it, and writes the number down: 4 feet 1 inch, half an inch under the morning. A heron lifts off the far bank. On the way back he closes the top gate of Lock 9, which he opened ten hours ago, and checks the paddles are down. Nobody came through today. The water stayed where it was put, which, he says, is the whole of the job on a good day.