Weyl Sato

Architekten
Klybeckstrasse 141
Basel

A practice of fourteen people making houses, public buildings and interiors in north-west Switzerland, founded in 2012 by Ines Weyl and Kenji Sato.

On site now: Primarschule Erlenmatt, Basel. Twelve classrooms on three floors, opening August 2027.

058 Primarschule Erlenmatt, Basel, on site

Weyl Sato

Index of works

Works

Ten works from 2018 to 2027. Seven are built, one is on site, two remain drawings. 4,810 m² completed in all.

Practice

We take on four or five commissions at a time and draw each of them until there is nothing left to take out. We publish our buildings as drawings, because a drawing shows what we decided and a photograph shows the weather.

Weyl Sato was founded in Basel in 2012 after Ines Weyl and Kenji Sato won the competition for a small library in Laufen that was never built. The office has grown slowly to fourteen people in one room on Klybeckstrasse, with a workshop for models at 1:20 behind it.

Most of our work comes through open competitions and from clients who have been in one of our buildings. We work in German, French, English and Japanese, and we teach one day a week at the school of architecture in Mendrisio.

Partners

  1. Ines Weyl

    Founding partner, public buildings

    Born
    1979, Zürich
    Studied
    ETH Zürich, diploma 2005
    Before
    Six years in practices in Porto and Rotterdam

    Leads the competitions and the public work. She draws the first plan of every project by hand and refuses to discuss elevations until the section is right.

  2. Kenji Sato

    Founding partner, houses and the workshop

    Born
    1977, Osaka
    Studied
    Kyoto Institute of Technology, then ETH Zürich
    Before
    Four years with a timber builder in Graubünden

    Runs the houses and the model workshop. Every built project has had a 1:20 model of its most difficult corner on his bench before it was drawn for the builder.

  3. Mara Oyelaran

    Partner since 2019, interiors and construction

    Born
    1985, London
    Studied
    The Bartlett, then EPF Lausanne
    Before
    Site architect on two Basel housing schemes

    Leads interiors, details and the sites. She writes the specifications and keeps the cost plan; no project of hers has finished more than three percent over budget.

Phases

We work through the six phases of the Swiss service model in order. A house typically takes two and a half years from the first meeting to the keys; a public building, four to six.

  1. 1

    Brief

    We read your brief back to you on one page, with what we think it leaves out. Then a fee proposal.

    2 to 4 weeks
  2. 2

    Studies

    Two site visits in different seasons. Three variants as 1:200 models, discussed side by side, one chosen.

    6 to 10 weeks
  3. 3

    Project

    The chosen scheme drawn at 1:50, the planning application, and a cost estimate to within ten percent.

    12 to 20 weeks
  4. 4

    Tender

    Construction drawings at 1:20 and 1:5, specifications, and at least three bids for every trade.

    10 to 16 weeks
  5. 5

    Building

    A partner on site every week, from the excavation to the last door handle. We keep the cost plan current every month.

    12 to 30 months
  6. 6

    Return

    We come back after one year of use, list what has not worked, and see it repaired.

    1 visit, 12 months on

Record

Awards

  • 2025Rhine Region Architects' Circle, award for Reading Room Liestal
  • 2024Prize for Timber in Public Building, shortlist, Rheinbord Bathhouse
  • 2022Vaud Heritage Foundation, renovation award, Cellar at Ollon
  • 2022Competition Primarschule Erlenmatt, first prize
  • 2020Competition Pier Tower Kreuzlingen, second prize
  • 2019Competition Reading Room Liestal, first prize

Publications

  • 2025Plan and Section, no. 34: "One room, five lights", on the Liestal reading room
  • 2024Quarterly of Building, spring: the Rheinbord Bathhouse in drawings
  • 2023Weyl Sato, Drawings 2012 to 2022, 212 pages, published by the office
  • 2021Notes on Houses, no. 9: Atelier House Arlesheim

Positions

Project architect80 to 100%, from March 2027

For the second half of Primarschule Erlenmatt and a housing competition in Riehen. You have at least five years in practice, have taken a building through tender and site in Switzerland, and work in German day to day.

Send a letter, a CV and a portfolio of no more than 20 pages as one PDF under 10 MB to work@weylsato.example. We reply to every application within three weeks.

Architecture intern12 months, from September 2027

For a student between bachelor and master. You will spend half of the year in the model workshop with Kenji Sato and half on competitions. Paid at CHF 3,400 a month, full time.

Applications open on 1 February 2027. Same address, same format.

Enquiries

Tell us about the site and what you want to build there. A partner reads every enquiry and replies within five working days, with a yes, a no, or a time to meet.

Project type

Construction budget

0 / 40 characters at least

We use your details only to answer this enquiry and delete them after twelve months.

Primarschule Erlenmatt

Basel, 2027. On site.

ABCDEF1234 05 m N
Ground floor plan, structural grid at 4,8 m
Axonometric, from the south-east
Client
Erlenmatt School Building Trust
Programme
Primary school for 12 classes, double gym, day care
Gross floor area
5,120 m²
Construction
Timber and concrete composite floors on concrete cores
Engineer
Huber Lenz Ingenieure, Basel
Dates
Competition 2022, on site since March 2025, opening August 2027
Team
Ines Weyl, Jonas Kessler, Lea Bruhin, Tomás Ferraz

Three floors of four classrooms each, stacked and shifted so that each floor roofs part of the yard below and opens onto the roof of the one beneath. The shifts give every classroom two orientations and a terrace the width of the room.

The structure is the plan: four concrete cores carry timber composite slabs spanning 9.6 metres without beams, so the classroom walls can move when the school does.

Haus am Rebberg

Riehen, 2025. Completed.

ABCDE123 05 m N
Ground floor plan, structural grid at 3,5 m
Axonometric, from the south-east, across the vineyard
Client
Private
Programme
House for a family of five, studio, wine store
Gross floor area
312 m²
Construction
Rammed concrete plinth, timber frame above, clay tile roof
Engineer
Huber Lenz Ingenieure, Basel
Dates
Commission 2021, completed June 2025
Team
Kenji Sato, Mara Oyelaran, Nils Amrein

The site falls eleven metres across the vineyard. The house sits on a plinth that holds the slope as a retaining wall would, with the living floor cut into it and the bedrooms in a gabled timber house laid on top.

One window per room, each placed for a single view: the church tower of Riehen, the Tüllinger hill, the vines directly below. The plinth is rammed from the excavated soil.

Reading Room Liestal

Liestal, 2024. Completed.

ABCDEF123 010 m N
Ground floor plan, structural grid at 8 m
Axonometric, from the south-east, Rathausstrasse
Client
Liestal Cantonal Library Foundation
Programme
Reading room for 140 desks, open stacks, archive, café
Gross floor area
2,840 m²
Construction
In-situ concrete, timber sawtooth roof with north lights
Engineer
Rossi Brandt Tragwerk, Zürich
Dates
Competition 2019, completed October 2024
Team
Ines Weyl, Jonas Kessler, Sara Imhof

One room, 48 metres long, under five north lights. No reader sits more than six metres from daylight that never falls directly on a page. The stacks run beneath the lights so that the books are lit as evenly as the desks.

The street front is a single long window at sitting height, with a bench along its full length. People wait for the bus on it.

Apartment Spalenberg

Basel, 2024. Completed.

ABCDE123 05 m N
Ground floor plan, structural grid at 3,5 m
Axonometric, cut away, from the south-east
Client
Private
Programme
Conversion of a 1720 attic into an apartment and library
Gross floor area
146 m²
Construction
Oak joinery, lime plaster, existing timber trusses kept
Engineer
Huber Lenz Ingenieure, Basel
Dates
Commission 2022, completed March 2024
Team
Mara Oyelaran, Nils Amrein

A single wall of oak shelves, 14 metres long, holds the owner's 4,000 books and hides the kitchen, a bed alcove and the stair. Everything else in the attic is left open under the old trusses.

The shelves are 31 centimetres deep throughout, the depth of the largest atlas in the collection.

Rheinbord Bathhouse

Basel, 2023. Completed.

ABCDEF123 010 m N
Ground floor plan, structural grid at 6,4 m
Axonometric, from the river, looking south-east
Client
Rheinbord Swimming Association
Programme
River bathhouse: changing rooms, lockers, sauna, kiosk, steps into the Rhine
Gross floor area
640 m²
Construction
Larch on a steel pier, concrete steps
Engineer
Rossi Brandt Tragwerk, Zürich
Dates
Competition 2020, opened May 2023
Team
Kenji Sato, Lea Bruhin, Tomás Ferraz

A larch pavilion on a steel pier, under a roof that overhangs the deck by two metres on the river side. Swimmers change, leave their clothes in a locker and walk down eleven concrete steps into the current.

The bathhouse closes from October to April. The roof stays open as a shelter on the river path all winter.

Court House Binningen

Binningen, 2022. Completed.

ABCD1234 05 m N
Ground floor plan, structural grid at 5,5 m
Axonometric, from the south-east
Client
Private
Programme
Single-storey house around a courtyard, with a two-storey studio
Gross floor area
268 m²
Construction
Fair-faced brick, concrete roof slab
Engineer
Huber Lenz Ingenieure, Basel
Dates
Commission 2019, completed September 2022
Team
Kenji Sato, Nils Amrein

Four wings on a square of 19 metres, closed to the street and open to an inner court of 8 by 8 metres. Every room has one wall of glass on the court and none on the street.

The studio wing rises a storey above the rest so that its north light clears the roofs. A single pear tree stands in the court.

Pier Tower Kreuzlingen

Kreuzlingen, 2020. Competition, 2nd prize.

ABCDE12 05 m N
Ground floor plan, structural grid at 4 m
Axonometric, from the lake, looking south-east
Client
Town of Kreuzlingen, open competition
Programme
Lookout tower and ticket office for the Lake Constance ferry
Gross floor area
90 m²
Construction
Precast concrete rings, steel stair
Engineer
Rossi Brandt Tragwerk, Zürich
Dates
Competition 2020, second prize, not built
Team
Ines Weyl, Kenji Sato, Sara Imhof

A tower of stacked concrete rings, 21 metres high, at the end of the ferry pier. A steel stair winds up the inside to a lantern room from which you can see three countries.

The jury preferred a scheme that kept the pier clear. We still think the lake needs a vertical.

Cellar at Ollon

Ollon, 2021. Completed.

ABCDE123 05 m N
Ground floor plan, structural grid at 5,6 m
Axonometric, cut through the vault, from the east
Client
Domaine des Crêtes, wine growers
Programme
Renovation of an 18th-century vaulted cellar for barrel ageing and tastings
Gross floor area
420 m²
Construction
Existing stone vault, new lime floor, oak barrel racks
Engineer
Gerber Chappuis, Lausanne
Dates
Commission 2019, completed November 2021
Team
Mara Oyelaran, Tomás Ferraz

A stone barrel vault 30 metres long, dug into the hillside in 1764. We removed two centuries of concrete repairs, laid a lime floor that breathes and set the barrels on oak racks that do not touch the walls.

The temperature holds at 12 degrees without machines. The only addition is a long oak table for tastings under the one opening.

Atelier House Arlesheim

Arlesheim, 2019. Completed.

ABCD12 05 m N
Ground floor plan, structural grid at 4,6 m
Axonometric, from the north-east
Client
Private, a sculptor
Programme
House and workshop, double-height studio under a north light
Gross floor area
184 m²
Construction
Insulating concrete, larch windows, zinc roof
Engineer
Huber Lenz Ingenieure, Basel
Dates
Commission 2016, completed April 2019
Team
Kenji Sato, Ines Weyl

A cube of insulating concrete, nine metres a side, with a roof that rises to a north light four metres wide. The studio fills the full height; the house is fitted around it on two floors.

The low wing holds the kiln and the stone saw, with a door wide enough for a forklift.

Funicular Station Weissenstein

Weissenstein, 2018. Competition entry.

ABCDEF12 010 m N
Ground floor plan, structural grid at 6,6 m
Axonometric, from the valley, looking north-west
Client
Weissenstein Mountain Railway, invited competition
Programme
Upper station: platform, waiting room, restaurant terrace
Gross floor area
380 m²
Construction
Concrete plinth cast against the rock, timber hall
Engineer
Gerber Chappuis, Lausanne
Dates
Invited competition 2018, not built
Team
Ines Weyl, Kenji Sato

The track arrives on a concrete ramp and stops inside a timber hall set on a plinth cast against the rock. Passengers step off the car and straight onto a terrace above the Aare valley.

Our first competition as a practice. We did not win it, and most of what we have built since started on these drawings.