Basil North Telemetry
Genovese Sweet Basil, Day 24 of 32 (NFT Channel)
Latest sample: 13:50
VPD 0.94 kPa
CO2 920 ppm
pH 5.92
EC 1.64 mS/cm
VPD Balance
0.94 / 0.95 kPa
-0.01 kPa
CO2 Enrichment
920 / 900 ppm
+20 ppm
Solution pH
5.92 / 5.90 pH
+0.02 pH
Nutrient EC
1.64 / 1.60 mS/cm
+0.04 mS
Bay Environment Ledger
| Bay and Cultivar | Stage | VPD (kPa) | CO2 (ppm) | pH | EC (mS/cm) | Canopy Temp / RH | Reservoir | State |
|---|---|---|---|---|---|---|---|---|
| B01 Basil NorthGenovese Sweet Basil | Vegetative (D24/32) | 0.94 | 920 | 5.92 | 1.64 | 23.4 C / 67% | 19.8 C (84%) | Nominal |
| B02 Leafy EastSalanova Butterhead | Head Fill (D19/28) | 0.82 | 780 | 5.84 | 1.38 | 20.8 C / 66% | 18.4 C (91%) | Nominal |
| B03 Microgreens SouthRed Rambo Radish | True Leaf (D08/10) | 1.18 | 640 | 6.38 | 1.12 | 24.6 C / 62% | 20.9 C (72%) | pH Drift |
| B04 Propagation WestHeirloom Seedling Plugs | Rooting (D06/14) | 0.58 | 560 | 5.76 | 0.86 | 22.1 C / 78% | 20.2 C (88%) | Mist High |
Irrigation and Grow-Light Schedule
PPFD Photoperiod
Fertigation Pulses
DLI: 23.0 mol/m2/d
Grow-Light Photoperiod
16h (05:00 to 21:00)
400 umol/m2/s
Spectrum recipe
Irrigation Fertigation
Pump Idle
30 min
5 min
Next auto: 14:00
Harvest Readiness Tracker
Projected 7-day yield: 84.2 kg
Logged today: 12.4 kg
-
BN-2408 Genovese Sweet Basil B01, 24 trays18.5 kgDay 24 / 32 (75%)
-
MS-0914 Red Rambo Radish B03, 36 trays14.2 kgDay 09 / 10 (Ready)
-
LE-1803 Salanova Butterhead B02, 30 trays34.0 kgDay 19 / 28 (68%)
-
PW-0602 Heirloom Seedling Plugs B04, 48 flats17.5 kg eqDay 06 / 14 (43%)
Sensor Alert and Calibration Log
| Time | Severity | Bay | Sensor | Diagnostic Note | Action |
|---|---|---|---|---|---|
| 13:42:18 | Warning | B03 | pH Probe #2 | Solution pH drifted to 6.38 (+0.38 above target). Acid doser priming queued. | |
| 13:19:05 | Advisory | B04 | Canopy RH | Relative humidity held at 78% after mist cycle. Exhaust louver opened to 35%. | |
| 12:51:44 | Warning | B03 | Reservoir Level | Tank B03 volume reached 72% threshold. RO auto-topoff valve scheduled at 14:00. | |
| 11:15:02 | Calibration | B01 | CO2 NDIR | Zero-point baseline verified at 410 ppm outdoor reference. Slope nominal. | Ack 11:20 |